Get a rough, early-stage estimate of bricks, cement, sand, and crush (aggregate) needed for your house construction in Pakistan, based on your plot size and number of floors.
Searching for a construction cost calculator Pakistan, a bricks calculator, or a house construction cost per marla estimate? This tool gives you a quick materials estimate based on your plot size.
How This Estimate Works
This calculator uses commonly cited rule-of-thumb ratios used by Pakistani contractors for early budgeting of a standard grey structure (walls, basic RCC slab): approximately 8.5 bricks, 0.4 bags of cement, 1.25 cft of sand, and 1 cft of crush per square foot of covered area per floor. Actual quantities vary significantly based on wall thickness, slab design, structural engineering requirements, and material wastage.
This tool gives a rough, early-stage approximation only and is not a Bill of Quantities (BOQ). Always get a detailed estimate from a qualified structural engineer or contractor before budgeting or purchasing materials. See our Disclaimer.
Frequently Asked Questions
How many bricks are required for a 5 Marla house in Lahore?
Using this calculator’s ratio of 8.5 bricks per sq ft of covered area at 80% plot coverage, a 5 Marla double-story house (about 2,178 sq ft of total covered area) needs roughly 18,500 bricks for the grey structure. Enter your own plot size and coverage percentage above for a figure matched to your design.
How many bricks are needed for a 120 square yard house in Karachi?
A 120 sq yard plot (1,080 sq ft) built double-story at 80% coverage works out to about 1,728 sq ft of total covered area, which needs roughly 14,700 bricks using this calculator’s ratio. Select “Square Feet” above and enter your own coverage percentage for a more precise number.
How many bags of cement are needed for a 10 Marla house?
At 80% coverage and double-story construction, a 10 Marla plot works out to about 4,356 sq ft of total covered area, needing roughly 1,740 bags of cement (50 kg each) by this calculator’s ratio. Actual requirements vary with slab thickness and structural design, so always confirm with your contractor.
How much sand and crush (aggregate) is needed for a 1 Kanal house?
A 1 Kanal (20 Marla) plot at 80% coverage, built double-story, comes to about 8,712 sq ft of total covered area — roughly 10,890 cubic feet of sand and 8,712 cubic feet of crush by this calculator’s ratio. Use the calculator above for an estimate matched to your own plot size and number of floors.